RJE Myanmar

Contact Details

RJE Myanmar
C-4, Thazin 1st street, Hlaing Yadanar Housing, Hlaing township, Yangon
Myanmar / Yangon
www.rjeglobal.com/myanmar

Management

NamePositionEmailPhone
U Sai Nyi NyiSai.NyiNyi@rjeglobal.com
Charlie KellagherProject Managercharlie.kellagher@rjeglobal.com
Paul MoynihanGeneral Managerpaul.moynihan@rjeglobal.com

Key Information

1996
RJE is an Engineering, Design, Project Management and Construction company which focus on HV, MV and LV Electrical, Instrumentation and Control works in the Mining & Resources, Power Generation & Distribution and Heavy Industrial sector

As well as Designing and Building plant RJE also offers a range of services and equipment to assist analyzing power systems, design, construction, testing and commissioning.

The firm is Australian-owned. It opened in Myanmar in 2015.

In Myanmar, RJE provides engineering design, construction, and commissioning services.
300MW SOLAR FARM IN MANDALAY REGION

RJE is contracted to perform grid connection works including full turnkey supply of 230lV Substations & 132kv Substations.
The specific work is:
• Remote End 230kV Thapyewa Switchyard extension and upgrades.
• Remote End 132kV Myingyan Switchyard extension and upgrades.
• Design, Construction and Commissioning of double circuit 230kV/132kV transmission line of approximately 30 miles.

YANGON GENERAL HOSPITAL 11KV NEUROLOGICAL SUBSTATION

The Ministry of Health contracted RJE for the following turnkey scope:
• Site clearing, civil works, earthing system, fencing, lighting, auxiliary services.
• Civil design for substation building and site layout
• Electrical design including protection and control systems, cable scheduling and SCADA/HMI integration.
• Installation and commissioning of 2 x 500kVA Power Transformers, 11kV Switchgear, 400V Switchboard, HV Cabling, protection cabinet, SCADA cabinet and control system and capacitor bank

SEIN PANN MYAING 66KV GIS SUBSTATION UPGRADE

RJE provided the below turnkey services to operate and comply with the Yangon climate and relevant IEC standards:
• Detailed design, GIS foundation design drawing and detailed calculation, civil works, earthing system, sub-station layout, fencing, lighting, auxiliary services, cabling drawings, protection & control.
• Incoming and outgoing for 66kV and 11kV underground lines, cable jointing, terminations, grounding work (including civil works), installation of ac/dc control panel, battery bank and charger installation, testing, commissioning, and energizing.
• In the Substation switchyard, installation of 11 sets of 66kV incoming gas insulated switchgear outdoor GIS (7 incoming + 4 outgoing).

MAGWAY DISTRIBUTION UPGRADES

RJE provided the following turnkey services at an international standard in multiple locations to construct the following installations:
• 11/0.4kV 100kVA Substation
• 11kV distribution line
• 0.4kV distribution line

YANGON GENERAL HOSPITAL 11KV SUBSTATION

The upgrade involved the installation of an 11kV Switchboard, supply and installation of two 1,000kVA distribution transformers and replacement of the 400V distribution system.
RJE carried out the following turnkey services compliant with IEC standards:
• Site clearing, civil works, earthing system, fencing, lighting, auxiliary services.
• Civil design for substation building and site layout
• Electrical design including protection and control systems, cable scheduling and SCADA/HMI integration.
• Installation and commissioning of 2 x 1000kVA power transformers, switchboard, 400V switchgear, HV cabling, protection cabinet, SCADA cabinet and control system and capacitor bank.

U WISARA ROAD 66KV SUBSTATION UPGRADE

RJE provided the below turnkey services to operate and comply with the Yangon climate and to relevant IEC standards:
• Detailed Design, GIS foundation design drawing and detailed calculation, civil works, earthing system, substation layout, fencing, lighting, auxiliary services, cabling drawings, and protection & control system.
• Incoming and outgoing for 66kV and 11kV underground lines, cable jointing, terminations, grounding work (including civil works), installation of AC/DC control panel, battery bank and charger installation, testing, and commissioning.
• In the substation switchyard, installation of 66kV incoming gas insulated switchgear outdoor GIS.

THAKETA FAST POWER 25MW INSTALLATION

In partnership with GE & Golden Green Energy, RJE completed the Design, Installation and Commissioning of a 25MW 50Hz trailer mounted gas turbine generator. RJE’s specific role completed to IEC standard include:
• Site management, project design works for civil, fuel & power control systems, project management for all site construction execution in conjunction with an EHS plan.
• Logistics, installation and integration of fuel system, power control system, substation works, piping, grounding and cabling & supports.
• Mechanical completion & fi rst synchronization of TM2500 unit.
• Quality control processes, coordination & interfacing services between International & local parties.
COD was achieved on July 8th with final acceptance from the client on August 2nd 2017.